EasyManua.ls Logo

ABB IRB 2000 - Page 22

ABB IRB 2000
117 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
15.
Tighten
the
screws
evenly
when
fastening
the
flange
joint.
16.
Ensure
that
the
joint
is
not
subjected
to
loads
before
the
sealing
compound
has
hardened
in
accordance
with
the
material
specification.
O-rings
17.
Check
the
O-ring
grooves.
The
grooves
shall
be
geometrically
correct
and
free
from
pores
and
contaminations.
18.
Check
the
O-ring
with
regard
to
surface
defects,
burrs,
accuracy
to
shape
etc.
19.
Ensure
that
the
correct
O-ring
size
is
used.
20.
Tighten
the
screws
evenly
during
the
mounting.
21.
Defective
O-rings
and
O-ring
grooves
shall
not
be
used.
22.
Mounting
of
defect
details
will
result
in
leakage.
Grease
the
O-ring
with
1171
4012-
201
before
mounting.
1.5
Instructions
for
Tightening
of
Screw
Joints
General
It
is
of
greatest
importance
that
all
screw
joint
are
tightened
with
the
correct
torque.
Application
The
following
tightening
torques
shall
be
used
for
all
screw
joints
in
metallic
materials
if
not
otherwise
specified
in
the
text.
The
instructions
do
not
apply
to
screw
joints
comprising
soft
or
brittle
materials.
For
screws
with
higher
property
class
than
8.8,
the
data
for
8.8
shall
be
used
unless
otherwise
specified.
5.14.3
Assembly
Screw
thread
dimension
M8
or
bigger
shall
preferrably
be
lubricated
with
oil.
Lubrication
with
molybdenum
disulphide
grease
shall
only
be
used
when
specified
in
the
text.
Screws
with
dimension
M8
or
bigger
shall
be
tightened
with
torque-key
if
possible.
Screws
with
dimension
M6
or
less
may
be
tightened
to
the
correct
torque
with
tools
without
torque
indication,
by
personnel
having
the
adequate
mechaniecal
training
and
instruction.
Mechanical
repair
IRB
2000

Other manuals for ABB IRB 2000

Related product manuals