2UCD074000E004_G
PCS100 AVC-40
Active Voltage Conditioner
Commissioning Checklist
This Commissioning Checklist is for use by
ABB Certified Engineers holding an Expert
Certificate and applies to PCS100 AVC-40s
with software version R2J4.
All steps in the checklist must be performed
and ticked during commissioning and the
completed document scanned and sent to
the ABB factory.
© Copyright 2020 ABB, All rights reserved.
PCS100 AVC
-40
300 kVA to 3000 kVA
Question and Answer IconNeed help?

Do you have a question about the ABB PCS100 AVC-40 and is the answer not in the manual?

Summary

Document Overview

The Company

Overview of ABB's expertise in power electronics and electrical technology.

Quality Control and Certification

Details on ISO 9001 accreditation and manufacturing standards.

Further Information Resources

Provides a link to download additional ABB publications.

Document Specifics

Document Identification Details

Ownership, number, issue date, and revision of the commissioning checklist.

Document Purpose and Scope

Explains what the document contains and its intended use.

Target Audience Identification

Specifies that commissioning engineers are the intended readers.

Required Prerequisites

Outlines necessary training and knowledge for commissioning engineers.

Applicable Software Revision

States the document applies to PCS100 AVC-40 with software revision R2J4.

Safety Information

General Safety Instructions

Provides essential safety warnings and guidance in multiple languages.

Critical Safety Notices

Highlights specific warnings for service, trained personnel, stored charge, and PPE.

Commissioning Procedures

1.1 Pre-Power Visual Checks

Visual inspection steps before applying power to the unit.

1.2 DIP Switch Settings Verification

Verifying DIP switch configurations on key system boards.

1.3 Power Connection Integrity Checks

Verifying power connections, wiring, and checking for short circuits.

1.4 Earth and Grounding Checks

Procedures for verifying proper earthing of the unit and transformer.

1.5 Frequency Conversion (50 Hz to 60 Hz)

Steps to change the machine's operating frequency if required.

1.6 Initial Power Up and Energization

Procedure for initial power application and system energization.

1.7 Stop-Enable Switch Functionality Test

Verifies the correct operation of the Stop-Enable switch.

1.8 No-Load Inverter Operation Test

Checks the inverter's correct operation without any load.

1.9 External Transformer Wiring Test

Verifies transformer wiring for units with separate enclosures.

1.10 Optional Transformer Thermal Test

Optional thermal test procedure for the transformer.

1.11 Load Performance Test

Verifies the unit's performance under load conditions.

1.12 Documentation and Handover Procedures

Procedures for service log, documentation, and training.

1.13 PCS100 AVC-40 System Settings

Lists and describes key system configuration parameters.

1.14 Commissioning Deviations Log

Section to list any outstanding issues encountered during commissioning.

1.15 Final Sign-Off

Final sign-off section for customer and commissioning engineer.

Summary

Document Overview

The Company

Overview of ABB's expertise in power electronics and electrical technology.

Quality Control and Certification

Details on ISO 9001 accreditation and manufacturing standards.

Further Information Resources

Provides a link to download additional ABB publications.

Document Specifics

Document Identification Details

Ownership, number, issue date, and revision of the commissioning checklist.

Document Purpose and Scope

Explains what the document contains and its intended use.

Target Audience Identification

Specifies that commissioning engineers are the intended readers.

Required Prerequisites

Outlines necessary training and knowledge for commissioning engineers.

Applicable Software Revision

States the document applies to PCS100 AVC-40 with software revision R2J4.

Safety Information

General Safety Instructions

Provides essential safety warnings and guidance in multiple languages.

Critical Safety Notices

Highlights specific warnings for service, trained personnel, stored charge, and PPE.

Commissioning Procedures

1.1 Pre-Power Visual Checks

Visual inspection steps before applying power to the unit.

1.2 DIP Switch Settings Verification

Verifying DIP switch configurations on key system boards.

1.3 Power Connection Integrity Checks

Verifying power connections, wiring, and checking for short circuits.

1.4 Earth and Grounding Checks

Procedures for verifying proper earthing of the unit and transformer.

1.5 Frequency Conversion (50 Hz to 60 Hz)

Steps to change the machine's operating frequency if required.

1.6 Initial Power Up and Energization

Procedure for initial power application and system energization.

1.7 Stop-Enable Switch Functionality Test

Verifies the correct operation of the Stop-Enable switch.

1.8 No-Load Inverter Operation Test

Checks the inverter's correct operation without any load.

1.9 External Transformer Wiring Test

Verifies transformer wiring for units with separate enclosures.

1.10 Optional Transformer Thermal Test

Optional thermal test procedure for the transformer.

1.11 Load Performance Test

Verifies the unit's performance under load conditions.

1.12 Documentation and Handover Procedures

Procedures for service log, documentation, and training.

1.13 PCS100 AVC-40 System Settings

Lists and describes key system configuration parameters.

1.14 Commissioning Deviations Log

Section to list any outstanding issues encountered during commissioning.

1.15 Final Sign-Off

Final sign-off section for customer and commissioning engineer.

ABB PCS100 AVC-40 Specifications

General IconGeneral
BrandABB
ModelPCS100 AVC-40
CategoryAir Conditioner
LanguageEnglish

Related product manuals