PCS100 AVC-40 Commissioning Checklist 3
Document Information
Copyright notice
The information in this manual is subject to change without notice. This manual and parts thereof must not be re-
produced or copied, or disclosed to third parties, nor used for any unauthorized purpose without written permis-
sion from ABB Ltd. The hardware and software described in this manual are provided under a license and may be
used, copied, or disclosed only in accordance with the terms of such license.
Document identification
Ownership: ABB Ltd., Power Conditioning Products
Document number: 2UCD740000E004
Issue date: 13/12/2021
Revision: Rev G
Contact information
Address: ABB Ltd. 111 Main North Road, Napier, New Zealand.
Website: https://new.abb.com/ups
This Document
This document contains information regarding:
commissioning of the PCS100 AVC-40
Usage
This document should be used when:
commissioning the PCS100 AVC-40
Who Should Read This Document?
This document is intended for:
commissioning engineers
Prerequisites
A Commissioning Engineer working with the PCS100 AVC-40 must:
be trained by ABB and have electrical operational and safety knowledge
have sufficient training to operate in an accidentally touch safe service environment
use this document in conjunction with the PCS100 AVC-40 User Manual and PCS100 AVC-40
Installation Checklist and ensure all of the installation checks have been performed prior to
completing this checklist
Software Revision
This document applies to PCS100 AVC-40 systems with software revision R2J4.