EasyManua.ls Logo

ABB PST30 - Page 30

ABB PST30
95 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
1L1
2T1
4T2
6T3
B1
B2
B3
3L2
5L3
1
100-250V
Stop
Start
In0
In1
Vc
AC/DC, 50/60 Hz
2
3
4
5
6
7
8
9
10
Vp
Vp
11
K4
12
13
14
Vn
15
16
K5
17
18
19
K6
20
LISTED 7F39
IND. CONT. EQ
.
1SFA 894 007
IEC 947-4-2
Ie: 37-72A
Us: 100-250V AC/DC
UL
Uc: 100-250V AC/DC
FLA: 37-68A
Made in Sweden
Ue: 220-230 380-400 500 V
72: AC-53a: 8-1.6:
In line 18,5 37 45 kW
Ue 208 220-240 440-480 V
PTC
Key-Pad
FELDBUSS
CAUTION
Fuse 250A TYPOWER ZILOX
Max short circuit current 65kA at
Wire 1-8 Al Cu 75C only, 35lb-in
Overload Capacity 115% of Continuous
L
N
Made in Sweden
PTCKey-Pad Fieldbus
Made in Sweden
PTCKey-Pad Fieldbus
5:3 Connection of communication devices (optional)
5:3.1 Fieldbus communication
The eldbus communication plug must be connected to the communication interface on the front of the PST,
see Figure 26. Make sure that the plug is in correct position and tighten the screw with 0.8 Nm (7.1 lb in) and
additional 1/4 turn.
For programming and other information, see Chapter 7 “ Settings and conguration” and Chapter 8 “ Field-
bus communication (option)”.
5:3.2 External keypad
An external keypad for door mounting can be connected to the softstarter. A 3-meter cable including both the
serial communication and the power supply to the keypad makes the connection.
The external keypad can also be used for transferring parameters from one softstarter to another during
commissioning (temporarily handheld). Note that NEMA 4/4X cannot be achieved when the keypad is not
mounted.
When thee external keypad is used, both keypads will work in parallel but the softstarter keypad always has
the highest priority if the keys on both units are pressed simultaneously.
5:3.3 Transferring parameters
To transfer (copy) parameters from one softstarter to another, connect the keypad to the chosen softstarter and follow the
sequence below.
5:3.3.1 Uploading parameters
Enter the menu Transfer par. Select To Keypad and conrm by pressing Select. A text Load to Keypad will be displayed..
Continue by pressing Execute and then Yes when the text Are You Sure is displayed. Transfer OK will now be displayed
if the transmission was successful. Otherwise, Transfer Not OK will be displayed.
Chapter 5
Connection
Figure 26: Fieldbus plug
Figure 27: Principle of a eldbus network with PST softstarters connected
Figure 28: External keypad
1L1
2T1
4T2
6T3
B1
B2
B3
3L2
5L3
1
100-250V
Stop
Start
In0
In1
Vc
AC/DC, 50/60 Hz
2
3
4
5
6
7
8
9
10
Vp
Vp
11
K4
12
13
14
Vn
15
16
K5
17
18
19
K6
20
LISTED 7F39
IND. CONT. EQ
.
1SFA 894 007
IEC 947-4-2
Ie: 37-72A
Us: 100-250V AC/DC
UL
Uc: 100-250V AC/DC
FLA: 37-68A
Made in Sweden
Ue: 220-230 380-400 500 V
72: AC-53a: 8-1.6:
In line 18,5 37 45 kW
Ue 208 220-240 440-480 V
PTC
Key-Pad
FELDBUSS
CAUTION
Fuse 250A TYPOWER ZILOX
Max short circuit current 65kA at
Wire 1-8 Al Cu 75C only, 35lb-in
Overload Capacity 115% of Continuous
L
N
Figure 29: Upload
5.8 Low Voltage Products & Systems
1SXU 132 021 M0201 ABB Inc. • 888-385-1221 • www.abb-control.com
5

Other manuals for ABB PST30

Related product manuals