Apply input signals as needed according to the actual hardware and
the application configuration made in PCM600.
1. Inject a symmetrical three-phase voltage and current at rated value.
2. Compare the injected value with the measured values.
The voltage and current phasor menu in the local HMI is located under Main
menu/Measurements/Analog primary values and Main menu/
Measurements/Analog secondary values.
3. Compare the frequency reading with the set frequency and the direction of the
power.
The frequency and active power are located under Main menu/Tests/
Function status/Monitoring/CVMMXN/1:CVMMXN/Outputs. Then
navigate to the bottom of the list to find the frequency.
Check both analog primary and secondary values, because
then the CT and VT ratios entered into the IED are also checked.
These checks shall be repeated for Analog primary values.
4. Inject an unsymmetrical three-phase voltage and current, to verify that phases
are correctly connected.
If some setting deviates, check the analog input settings under
Main menu/Configuration/Analog modules
Measured values such as current and voltages as well as active, reactive and
apparent power, power factor phase angles as well as positive and negative and
zero sequence currents and voltages are available in the local HMI under Main
menu/Tests/Function status/Monitoring.
Navigate to the measurement function that contains the quantity to be checked.
Table 1: Measurement functions
Function
Quantity Description
CMMXU IL1 to IL3 amplitude, range and angle
CMSQI 3I
0
; I1 and I2 amplitude, range and angle
CVMMXN S; P; Q; PF; Ilag; Ilead; U; I and
f
amplitude, range and angle
VMMXU UL12 to UL31 i.e. phase-to-
phase
amplitude, range and angle
VMSQI 3U
0
; U1 and U2 amplitude, range and angle
VNMMXU UL1 to UL3 i.e. phase-to-neutral amplitude, range and angle
Section 5 1MRK 511 248-UEN -