EasyManua.ls Logo

ABB REL 505-C1 2.3 Series - User Manual

ABB REL 505-C1 2.3 Series
118 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Loading...
© ABB Automation Products AB 2001
Substation Automation Division
Installation and commissioning manual
REL 505-C1*2.3
Overcurrent protection terminal
About this manual
DocID: 1MRK 506 094-UEN
Issue date: June 2001
Status: New
Version: 2.3
Revision: 00

Table of Contents

Question and Answer IconNeed help?

Do you have a question about the ABB REL 505-C1 2.3 Series and is the answer not in the manual?

ABB REL 505-C1 2.3 Series Specifications

General IconGeneral
ManufacturerABB
ModelREL 505-C1 2.3 Series
CategoryTouch terminals
Display TypeTFT LCD
DisplayColor
Display Size5.7 inches
Resolution320 x 240 pixels
Power Supply24V DC
Protection ClassIP65
CommunicationEthernet

Summary

Chapter 1 Introduction

About the Complete Set of Manuals

Details the four manuals comprising the user's complete manual set.

About the Installation and Commissioning Manual

Describes the content, structure, and purpose of this specific manual.

Intended Audience

Identifies the personnel for whom this manual is intended.

Related Documents

Lists other relevant documentation for the terminal.

Revision Notes

Records changes and updates made to the manual.

Chapter 2 Safety Information

Warning Signs

Presents critical safety warnings regarding electrical hazards, high voltage, and equipment handling.

Caution Signs

Highlights important precautions for handling modules, avoiding damage, and preventing electrical shock.

Note Signs

Provides additional notes and important information for operation and configuration.

Chapter 3 Overview

Commissioning and Installation Overview

Provides a general overview of the key tasks involved in terminal installation and commissioning.

Chapter 4 Unpacking and Checking the Terminal

Receiving, Unpacking, and Checking

Details the procedures for receiving, unpacking, inspecting, and checking the terminal upon delivery.

Chapter 5 Installing the Terminal

Installation Overview and Mounting Procedures

Covers installation environment, space requirements, and various mounting options like rack, flush, and wall.

Electrical Connections and Optical Fibre Installation

Details procedures for all electrical connections and optical fibre installation.

Chapter 6 Checking the External Circuitry

Overview of External Circuitry Checks

Explains the purpose of checking external circuitry with the terminal de-energised.

Checking CT and VT Circuits

Procedures for checking CT and VT wiring, polarity, and grounding.

Checking the Power Supply

Verifies the auxiliary supply voltage and polarity are within specifications.

Checking Binary I;O Circuits

Procedures for checking binary input and output circuits for correct level and polarity.

Chapter 7 Energising the Terminal

Overview of Energising Procedures

Outlines the steps and initial checks required after energizing the terminal.

Energising the Terminal

Details the sequence for energizing the terminal and interpreting HMI indicators during startup.

Checking Self-Supervision

Covers reconfiguring I/O modules, setting terminal time, and diagnosing self-supervision failures.

Chapter 8 Setting and Configuring the Terminal

Setting and Configuration Overview

Discusses setting parameters, configuration files, and general methods for terminal configuration.

Local HMI Settings Entry

Describes how to enter settings directly via the terminal's local HMI interface.

PC-based Settings Download and Configuration

Procedures for establishing communication via ports and downloading settings/configurations from a PC.

Chapter 9 Establishing Connection and Verifying SPA;IEC Communication

Entering Communication Settings

Instructions for setting the rear SPA or IEC port, including slave number and baud rate.

Verifying Communication

Methods to verify SPA and IEC communication using test procedures and event generation.

Chapter 10 Verifying Settings by Secondary Injection

Test Preparation Overview

Lists required tools and general principles for performing secondary injection testing.

Connecting Test Equipment

Details preparing connections, using test switches, and setting the terminal to test mode.

Verifying Inputs and Releasing Functions

Procedures for verifying analog inputs, connection, and releasing specific functions for testing.

Disturbance Report Settings

Configuration of disturbance report settings for testing purposes.

Chapter 11 Verifying the Internal Configuration

Overview of Internal Configuration Verification

General overview of verifying internal communications and output signals for protection functions.

Testing Distance Protection Interaction

Procedure to test the interaction of distance protection zone 1 with surrounding equipment.

Chapter 12 Testing the Protection System

Overview of System Performance Testing

Outlines scheme performance testing before the protected object is taken into service.

Testing Distance Protection Interaction

Procedure to test distance protection interaction with transient faults and autoreclosing functions.