Do you have a question about the ABB REL 505-C1 2.3 Series and is the answer not in the manual?
| Manufacturer | ABB |
|---|---|
| Model | REL 505-C1 2.3 Series |
| Category | Touch terminals |
| Display Type | TFT LCD |
| Display | Color |
| Display Size | 5.7 inches |
| Resolution | 320 x 240 pixels |
| Power Supply | 24V DC |
| Protection Class | IP65 |
| Communication | Ethernet |
Details the four manuals comprising the user's complete manual set.
Describes the content, structure, and purpose of this specific manual.
Identifies the personnel for whom this manual is intended.
Lists other relevant documentation for the terminal.
Records changes and updates made to the manual.
Presents critical safety warnings regarding electrical hazards, high voltage, and equipment handling.
Highlights important precautions for handling modules, avoiding damage, and preventing electrical shock.
Provides additional notes and important information for operation and configuration.
Provides a general overview of the key tasks involved in terminal installation and commissioning.
Details the procedures for receiving, unpacking, inspecting, and checking the terminal upon delivery.
Covers installation environment, space requirements, and various mounting options like rack, flush, and wall.
Details procedures for all electrical connections and optical fibre installation.
Explains the purpose of checking external circuitry with the terminal de-energised.
Procedures for checking CT and VT wiring, polarity, and grounding.
Verifies the auxiliary supply voltage and polarity are within specifications.
Procedures for checking binary input and output circuits for correct level and polarity.
Outlines the steps and initial checks required after energizing the terminal.
Details the sequence for energizing the terminal and interpreting HMI indicators during startup.
Covers reconfiguring I/O modules, setting terminal time, and diagnosing self-supervision failures.
Discusses setting parameters, configuration files, and general methods for terminal configuration.
Describes how to enter settings directly via the terminal's local HMI interface.
Procedures for establishing communication via ports and downloading settings/configurations from a PC.
Instructions for setting the rear SPA or IEC port, including slave number and baud rate.
Methods to verify SPA and IEC communication using test procedures and event generation.
Lists required tools and general principles for performing secondary injection testing.
Details preparing connections, using test switches, and setting the terminal to test mode.
Procedures for verifying analog inputs, connection, and releasing specific functions for testing.
Configuration of disturbance report settings for testing purposes.
General overview of verifying internal communications and output signals for protection functions.
Procedure to test the interaction of distance protection zone 1 with surrounding equipment.
Outlines scheme performance testing before the protected object is taken into service.
Procedure to test distance protection interaction with transient faults and autoreclosing functions.