EasyManua.ls Logo

ABB REL 505-C1 2.3 Series - Page 84

ABB REL 505-C1 2.3 Series
118 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
78
High speed binary output logic (HSBO) Chapter 10
Verifying settings by secondary
injection
ZC1P/SchemeType = PermissiveOR
Same result as for the permissive underreach test should be ob-
tained.
2. Remove applied signals.
Test for three of the trip schemes in ZCOM (Blocking Scheme not included) together
with TRIP.
Procedure
1. Apply inputs in different combinations to TRIP-PSLn, ZCOM-
CACC and ZCOM-CR and check the outputs of HSBO-TRLx.
For each trip test the blocking action for all three HSBO block-
ing inputs, ZCOM-BLOCK and TRIP-BLOCK. Check results
according to the used scheme and trip program.
ZCOM/SchemeType = Intertrip
TRIP/Program = 1/2/3ph
When -PSLn is applied in the same time as -CR, a trip output
should appear in the n-phase(s), HSBO-TRLn.
ZCOM/SchemeType = PermissiveUR
TRIP/Program = 1/3ph
When -PSLn is applied in the same time as -CACC and -CR, a trip
output should appear in the n-phase(s), HSBO-TRLn.
ZCOM/SchemeType = PermissiveOR
TRIP/Program = 3ph
Each time -CACC and -CR are activated at the same time, a three-
phase trip should be obtained, independent of any phase selection
(-PSLn).
2. Remove applied signals.

Table of Contents

Related product manuals