Figure 47: Test of RTC with I/O
10.17 Basic IED functions
10.17.1 Parameter setting group handling SETGRPS
Prepare the IED for verification of settings as outlined in section "Requirements" and
section
"Preparing for test" in this chapter.
10.17.1.1 Verifying the settings
1. Check the configuration of binary inputs that control the selection of the active
setting group.
2. Browse to the ActiveGroup menu to achieve information about the active
setting group.
The ActiveGroup menu is located on the local HMI underMain menu/Test/
Function status/Setting groups/ActiveGroup
3. Connect the appropriate dc voltage to the corresponding binary input of the IED
and observe the information presented on the local HMI.
The displayed information must always correspond to the activated input.
4. Check that the corresponding output indicates the active group.
Operating procedures for the PC aided methods of changing the active setting
groups are described in the corresponding PCM600 documents and instructions
for the operators within the SCS are included in the SCS documentation.
1MRK 506 355-UEN A Section 10
Testing functionality by secondary injection
Line distance protection REL670 2.1 IEC 243
Commissioning manual