12.2.2.8 Restoring
Maintenance is very important to improve the availability of the protection system by
detecting failures before the protection is required to operate. There is however little
point in testing healthy equipment and then putting it back into service with an open
terminal, with a removed fuse or open miniature circuit breaker with an open
connection, wrong setting, and so on.
Thus a list should be prepared of all items disturbed during test so that all can be put
back into service quickly and without overlooking something. It should be put back
into service item by item and signed by the responsible engineer.
1MRK 506 355-UEN A Section 12
Commissioning and maintenance of the fault clearing system
Line distance protection REL670 2.1 IEC 253
Commissioning manual

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the ABB Relion 670 Series REL670 and is the answer not in the manual?

ABB Relion 670 Series REL670 Specifications

General IconGeneral
BrandABB
ModelRelion 670 Series REL670
CategoryProtection Device
LanguageEnglish

Related product manuals