EasyManua.ls Logo

ABB TPS57-F Series - Page 65

ABB TPS57-F Series
130 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Operation Manual / TPS44-F.. - TPS61-F..
Maintenance
5
Turbine cleaning during operation
5.3
Page 63
April 2015 HZTL2412_EN Revision E
Recommended operating state for turbine wet cleaning
The following operating state has been tested and is approved by ABB
Turbo Systems:
Characteristic / component
Conditions
short
water injection time
long
water injection time
Engine load (guide value) 20 40 %
Turbine inlet temperature
T
TE
before water injection
350400 °C
350430 °C
Water supply ensured
Water pressure
(overpressure over
atmosphere) p
WT
2.0 bar
1.5 bar
If necessary, engine performance must be reduced to maintain these
conditions.
The cleaning cycle can now be started based on the following description.
© Copyright 2015 ABB. All rights reserved.

Table of Contents

Other manuals for ABB TPS57-F Series

Related product manuals