46
NOTE
Tightening must be carried out with the correct
torque
4.3.2 Main earthing circuit connections between
the panels of the SBR functional unit
4.3.3 Connection of the main earthing circuit for
WBC – WBS units
4.4 Final installation work
Checkpoints
•
•
•
•
•
•
•
•
•
Figure 117. Earthing busbar installed
Figure 118. Positions of the earthing cables
Figure 119. Main protection earthing busbar of the SBR unit
—