26
1
ZENITH ZTS(D) T-SERIES 1600-3000 A & ZTSCT T-SERIES 100-3000 A
SOURCE 1 priority (SOURCE 2 = generator)
Switch position I
Switch position O
Switch position II
Generator started
Pre-transfer signal
Load shed signal
Generator stop delay
Center-off delay, I - O - II
Load shed delay
—
Table 2.3 Automatic Switching Sequences, SOURCE 1 Priority (SOURCE 2 = Generator)