EasyManuals Logo

ABB Zenith ZTS T Series User Manual

ABB Zenith ZTS T Series
130 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #3 background imageLoading...
Page #3 background image
3
1
OPERATION, MAINTENANCE, AND INSTALLATION GUIDE
Receiving, handling and storage
Receiving and handling
Upon receipt, carefully inspect the trans-
fer switch for damage that may have oc-
curred during transit. If damage is evi-
dent, or there is visible indication of
rough handling, immediately file a dam-
age claim with the transportation com-
pany, and notify your local ABB sales
office.
Do not remove the shipping packaging
until ready to install the switch.
Storage
If the unit will not be placed into service
immediately, store the transfer switch in
its original package in a clean, dry loca-
tion. To prevent condensation, maintain a
uniform temperature. Store the unit in a
heated building, allowing adequate air
circulation and protection from dirt and
moisture. Storing the unit outdoors could
cause harmful condensation inside the
transfer switch enclosure.
HAZARD OF EQUIPMENT
OVERTURNING
When moving with a fork lift, do not
remove the shipping packaging until the
device is in its final location.
Failure to follow this instruction may
result in personal injury or equipment
damage.
Warning
Indicates a hazardous situation that, if not
avoided, could result in death or serious
injury.

Other manuals for ABB Zenith ZTS T Series

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the ABB Zenith ZTS T Series and is the answer not in the manual?

ABB Zenith ZTS T Series Specifications

General IconGeneral
BrandABB
ModelZenith ZTS T Series
CategorySwitch
LanguageEnglish

Related product manuals