EasyManua.ls Logo

ACHI IR6500 - Operational Tips and Software Interaction; Environmental Checks and Fan Usage; Lead and Lead-Free Reflow Temperatures; Running the Rework Station via IRSOFT

ACHI IR6500
20 pages
Print Icon
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
20
3/
Please check Rework station surrounding environment, as far as possible away
from the air outlet and other sources.
4/ Do not open upper fan in the welding process,
5/ Just remember that:
The max tempertature of lead rework is approximately 183
,
0
00
0Reflow temp:185
1
11
1190
,
Reflow time: 10 Sec2
22
2
that of lead free is approximately 217
.
0
00
0Reflow temp:220
1
11
1225
Reflow time: 15 Sec2
22
2
6/ No matter you click "Run" in the IRSOFT or Push the “start switch” on the
control board
Rework station will be autorun current program segment in the
Temperature Controller!
So you must Select the appropriate temperature program segment in the
“PTN ”windows, or You can downloaded IRSOFT’data to the controller, covered,
then run.

Related product manuals