EasyManua.ls Logo

Action SPARK - Joint

Default Icon
21 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
14
SPARK by Action Trampoline Climbing Bar
Step 3
1. Insert Joint 2 (5) between the gap in the frame. Be sure that the metal tab is resting flush on
trampoline frame.
2. Secure pole to the trampoline frame with Bolt 2 (10) into Joint 1 (3).
3. Repeat for the second pole.
Assembly Instructions (cont)
NOTE: Joint 1 (3) should sit flush against the trampoline frame and should line up with Joint
2 (5).
NOTE: If you have any problems by this stage, please do not try to install the accessory and call 1800 465 070
5
10
2
1
Joint 2