CHECKS BEFORE STARTING UP
Check that the safety valves (DHW and primary) are correctly installed and that the outlets are
connected to the sewer.
Check that the DHW tank and the primary circuit are filled with water.
Check that the air has been correctly bled from both circuits.
Check that the tanks upper air bleed valve is tight.
Check that the water side and heat source side pipes are correctly connected and not leaking.
STARTING UP
To put the installation into service, refer to the heating boiler manual.