AEG QUICK INSTALLATION GUIDE | HYBRID INVERTER SERIES AS-ICH02-2/HV VERSION: PD202208 V1-1-22 5
AEG HYBRID INVERTER QUICK INSTALLATION GUIDE SERIES AS-ICH02-2 | VERSION: PD202208 V1-1-22
1.4 EU Declaration of Conformity
The inverters sold in the European market meets the following directives and requirements:
Electromagnetic compatibility Directive 2014/30/EU (EMC)
Electrical Apparatus Low Voltage Directive 2014/35/EU (LVD)
Radio Equipment Directive 2014/53/EU (RED)
Restrictions of Hazardous Substances Directive 2011/65/EU and (EU) 2015/863 (RoHS)
Waste Electrical and Electronic Equipment 2012/19/EU
Registration, Evaluation, Authorization and Restriction of Chemicals (EC) No 1907/2006 (REACH)
You can download the EU Declaration of Conformity on https://www.aeg-industrialsolar.de/service/downloads/.
1.5. LED Indicators
I
n
d
i
c
a
t
o
r
S
t
a
t
u
s
D
e
s
c
r
i
p
t
i
o
n
ON = The system is ready.
BLINK = The system is starting.
OFF =The system is not working.
-UP
ON = Back-up is ready / power available.
OFF = Back-up is off / power not available.
ON = The battery is charging.
BLINK 1 = The battery is discharging.
BLINK 2 = The battery is low / soc is low.
OFF = The battery is disconnected / not active.
ON = The grid is active and connected.
BLINK = The grid is active but not connected.
OFF = The grid is not active.
ON = Consuming energy from grid / buying.
BLINK 1 = Supplying energy to grid / zeroing.
BLINK 2 = Supplying energy to grid / selling.
OFF = The grid is not connected or the system is not working.
ON = Both BMS communication and meter communication are ok.
BLINK 1 = BMS communication fails; meter communication is ok.
BLINK 2 = BMS communication is ok; meter communication fails.
OFF = BMS communicationand meter communication fail.
ON = WiFi connected / active.
BLINK 1 = WiFi is resetting.