EasyManua.ls Logo

AEG DDLE Basis 11 - Standard Installation for Contractors; General Installation Information; Installation Site; Preparing the Device Installation

AEG DDLE Basis 11
17 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
26
For contractors
3.1 General installation information
At the factory, the device is prepared for a power connection from the top from an installation below
the plaster (see Fig.
C
-
I
):
s 4HEDEVICEISSUITABLEFORABOVEORUNDERSINKINSTALLATION
C
.
s 7ATERCONNECTIONTHREADEDlTTINGSBELOWTHEPLASTER
s 0OWERCONNECTIONBELOWTHEPLASTERINTHEUPPERDEVICEAREA
Important information regarding the DDLE Basis 18/21/24 with connected load changeover
In its delivered condition the device is set to 21 kW. When changing to a different output, carry out the
following steps:
s Re-plug the coding card
Re-plug the coding card (
A
8) according to the selected output; for selectable output and fuse protection
see “Specification“.
Mark the connected load on the type plate (
A
19), with a permanent marker.
s Replace the flow limiter
If 24 kW connected load has been selected, replace the fitted flow limiter (
O
30, white) with the flow limiter
supplied ( orange, fixed to the cold water pipe).
3.2 Installation site
Install the instantaneous water heater according to the figure
C
(a-oversink or b-undersink) vertically, flush
with the wall and in a room free from the risk of frost.
3.3 Preparing the device installation
s /PENTHEDEVICE
D
:
a Disengage the locking device with a screwdriver.
b Open and remove the device cap.
s 2EMOVETHELOWERPARTOFTHEBACKPANEL
E
:
a Push in both locking hooks.
b Remove the lower part of the back panel towards the front.
s "REAKOUTTHECABLEGROMMETKNOCKOUTINTHEBACKPANEL (
F
a). If, by mistake, the wrong knock-out has
been opened, use a new back panel.
s 4RIMTHEPOWERCABLETOSIZE (
F
b).
s 2EMOVETHEPROTECTIVETRANSPORTPLUGSFROMTHEWATERCONNECTIONS.
3.4 Fitting the mounting bracket
G
s -ARKOUTTHEHOLESTOBEDRILLEDUSINGTHEINSTALLATIONTEMPLATESUPPLIEDEXISTINGSUITABLE!%'MOUNTING
bracket can be used).
s 3ECURETHEMOUNTINGBRACKETWITHSCREWSANDRAWLPLUGSNOTPARTOFTHESTANDARDDELIVERYSELECTIN
accordance with the material of the fixing wall).
s )NSERTTHESTUDSSUPPLIEDINTOTHEMOUNTINGBRACKET
3.5 Equipment installation
G
s Seal in and insert the twin nipples.
s 0USHTHECABLEGROMMETOVERTHEPOWERCABLE
s 3LIDETHEBACKPANELOVERTHESTUDSANDTHECABLEGROMMETPULLTHECABLEGROMMETWITHAPAIROFPLIERS
against the locking hooks and let both hooks audibly click into place.
s 0USHTHEBACKPANELlRMLYANDmUSHAGAINSTTHEWALLANDLOCKWITHTHElXINGTOGGLE!TTHEBOTTOM
the device can be secure with 2 additional screws (
M
25).
3.6 Water connection
H
s Position the threaded connections with flat packing onto the twin nipples; for this observe the correct
seating of the connections (never twist the bayonet closures inside the device).
Important information:
s 4HOROUGHLYmUSHTHECOLDWATERSUPPLYLINE
s )FTHECORRECTFUNCTIONCANNOTBEASSUREDDUETOINADEQUATEmOWPRESSUREEG-0ABARREPLACE
the flow limiter (
O
30) and reinsert the profile washer (
O
31). If necessary, increase the pressure in the
water installation.
3. Standard installation for contractors
Power: Unfinished walls - top; Water: Unfinished walls

Other manuals for AEG DDLE Basis 11

Related product manuals