Do you have a question about the AERMEC ANL 025 and is the answer not in the manual?
Install by qualified technician, follow local laws, take precautions, and read manual.
Agree location with client, ensure base support, respect safe distances, install by qualified technician.
Key requirements for electrical connections like circuit breaker, earthing, and phasing.
Verify compressor current, noise, voltage, leaks, superheat, and discharge temperature.
Check high pressure pressostat, anti-freeze protection, and other safety features.
Checks for heat exchanger efficiency, compressors, pressures, leaks, and filter drier.