EasyManua.ls Logo

AERMEC ANL User Manual

AERMEC ANL
40 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
BARCODE
EN
Installation and Maintenance Manual
TRANSLATION FROM ORIGINAL
21.11. 6755517_05
EN
DHW PRODUCTION UP TO 122°F
EXTERNAL AIR TEMPERATURE UP TO 14°F
AVAILABLE VERSION WITH BUILTIN HYDRONIC KIT
ANL 60Hz
Technical and Installation manual
60Hz
Question and Answer IconNeed help?

Do you have a question about the AERMEC ANL and is the answer not in the manual?

AERMEC ANL Specifications

General IconGeneral
Cooling capacityNot available
Heating CapacityNot available
EERNot available
RefrigerantNot available
Compressor typeNot available
Sound pressure levelNot available
Sound Power LevelNot available
Power SupplyNot available
WeightNot available
Dimensions (HxWxD)Not available

Summary

3. CONFIGURATOR

4. MAIN COOLING LAYOUT

5. DESCRIPTION OF COMPONENTS

5.6. ELECTRIC COMPONENTS

7. HEAT EXCHANGER SELECTION CRITERIA

8. TECHNICAL DATA

COOLING MODE DATA

Technical data for cooling mode: capacity, power, flow rates.

HEATING MODE DATA

Technical data for heating mode: capacity, power, flow rates.

ELECTRICAL DATA

Electrical specifications: input current, peak current.

9. OPERATING LIMITS

9.1. COOLING MODE LIMITS

Defines operating limits for cooling mode via graphical representation.

9.2. HEATING MODE LIMITS

Defines operating limits for heating mode via graphical representation.

10. GLYCOL SOLUTIONS

11. PRESSURE DROP

15. GENERAL WARNINGS

IMPORTANT GENERAL INSTRUCTIONS

Key risks and general instructions for safe operation.

PRECAUTIONS AGAINST RESIDUAL RISKS

Precautions against mechanical and other hazards during maintenance.

PREVENTION OF CHEMICAL/FIRE/ENVIRONMENTAL RISKS

Precautions for chemical, fire, and environmental hazards.

17. STORAGE

PLACEMENT AND INSTALLATION REQUIREMENTS

Essential requirements for unit placement and installation.

18. HYDRAULIC CONNECTIONS

19. HYDRAULIC CIRCUITS OF PRINCIPLE

21. ANTIVIBRATION POSITIONING

23. ELECTRICAL CONNECTIONS

25. COMMISSIONING AND WARNINGS

START-UP PROCEDURES

Preparatory steps before powering up the unit.

PRE-POWER CHECKS

Checks to perform before applying power.

POST-POWER CHECKS

Checks to perform once the unit is powered on.

FINAL COMMISSIONING

Final steps for commissioning the unit.

OPERATING CHECKS

Checks to perform while the machine is running.

26. MAINTENANCE

MAINTENANCE PERSONNEL AND PRECAUTIONS

Emphasizes maintenance by authorized personnel and general precautions.

RESIDUAL RISK PRECAUTIONS

Precautions against mechanical and other hazards during maintenance.

CHEMICAL, FIRE, ENVIRONMENTAL RISK PREVENTION

Precautions for chemical, fire, and environmental hazards.

27. PERIODIC MAINTENANCE INTERVENTIONS

CENTRIFUGAL COMPRESSOR MAINTENANCE

Related product manuals