Do you have a question about the AeroWorks ULTIMATE 20-300 ARF-QB and is the answer not in the manual?
Outlines the warranty terms and conditions for the kit.
Details the installation of wing components and servos.
Guides the installation of stab and elevator components and servos.
Covers rudder installation, servos, and pull-pull cable setup.
Steps for installing the main landing gear and wheel pants.
Process for mounting the aircraft engine, including template use.
Process for installing the engine ignition system components.
Steps for installing the radio receiver and power system batteries.
Essential checks and preparations before the first flight.
Instructions for setting CG and control surface throws.
Comprehensive checklist for pre-flight safety and system checks.