Airwell Itelco-Clima CLS 182 STD - 5 START-UP; 5.1 Preliminary Checks; 5.2 Start-up Sequence

Airwell Itelco-Clima CLS 182 STD
83 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Page 18
Installation
Terminal box CLS/CLH/CLC STD-LN-ELN-HPF-HT
REMOTE START/STOP SWITCH
REMOTE SEL. OF COOLING/HEATING MODES
FLOW METER
EXTERNAL INTERLOK/PUMP CONSENT
COMMON
ANTIFREEZE CONTROL (MAX 0,5 AMP 230 Vac)
EXTERNAL PUMP CONTROL (MAX 0,5 AMP 230 Vac)
ALARMED MACHINE 1-2
COMPRESSOR 1 ON
COMPRESSOR 2 ON
LOW WATER LEVEL IN TANK
FORCED HEATING ENABLED - II DEGREE
(SRS)
(COMMON)
(SRHP)
(SF)
Terminal box CLH EH
Manuale CLS-CLH1 7.2.2005 10:17 Pagina 18