EasyManua.ls Logo

Akai AC-ZP112

Akai AC-ZP112
25 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Operation
Window kit installationTake the example with three parts of tracks.
1. Loose nut anti clockwise and unscrew such as Fig 1.
2. adjust the washer on board 1 at the sliding groove on board 2, and then insert the
fixation board 2 in the fixation board 1 such as fig.2
3. adjust according to own window size and fix nut on the fixation board 1
clockwise such as fig.3
-12-

Related product manuals