EasyManua.ls Logo

ALLEN & HEATH iLive Series

ALLEN & HEATH iLive Series
2 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Loading...
Process Point:
ALLEN&HEATH
Programming
AH-M0264
Assembly data
Production line iLiveSeries
Product ilive SBC Fujitsu 004-111
Assembly stage Programming
Issue Date 22/07/11
1 Unpack the Fujitsu SBC (AE8214) from the bag and keep the bag for later
2 Fit the RAM(AE8229) into the SBC
3 Get and fit a programmed Flash card (with
the Fujitsu sticker) in to the SB
4 Plug up the SBC as shown in the picture below
5 Ensure that the power supply is on
6 Press the start-up switch on the little screen as shown and
the SBC should start to boot. You should hear a beep.
7 Quickly after you have powered up the SBC hold down F2
to enter the BIOS Setup
Page 1/2
TFT
SWITCH
MONITOR
VGA
KEYBOARD
POWER

Other manuals for ALLEN & HEATH iLive Series

Question and Answer IconNeed help?

Do you have a question about the ALLEN & HEATH iLive Series and is the answer not in the manual?

ALLEN & HEATH iLive Series Specifications

General IconGeneral
Sampling Rate48kHz
TypeDigital Mixing System
FadersMotorized
Ethernet PortsYes
Recallable PreampsYes
Built-in Rackmount MixerNo
WeightVaries by model
FX Engines8
Remote ControlYes, via Ethernet
Audio NetworkingDante
EQ4-band parametric per channel
DynamicsCompressor, gate on every channel
EffectsReverb, Delay
Digital ConnectivityMADI
Control Surface OptionsVarious surface sizes available
ExpandabilityYes
CompatibilityCompatible with iLive MixRacks and Surfaces

Summary

SBC Hardware Preparation and BIOS Access

Component Installation

Install RAM and programmed Flash card into the Fujitsu SBC.

Connection and Power-Up

Connect SBC to peripherals and ensure power supply is on.

Entering BIOS Setup

Start the SBC and press F2 to access BIOS setup.

BIOS Configuration and Finalization

Configure BIOS Settings

Adjust boot features, LCD parameters, security, and power recovery in BIOS.

Save and Verify Configuration

Save BIOS changes and reboot to confirm proper boot.

Final Assembly Steps

Power down, disconnect, fit flash card holder, and store SBC.

Related product manuals