EasyManua.ls Logo

Alliance Laundry Systems DTB50CG User Manual

Alliance Laundry Systems DTB50CG
172 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
Installation/Operation/Maintenance
Drying Tumblers
30 Pound Capacity (28" Wide)
30 Pound Capacity (31.5" Wide)
50 Pound Capacity
75 Pound Capacity
120 Pound Capcity
170 Pound Capacity
Model Numbers in this manual
are shown on page 5
KEEP THESE INSTRUCTIONS FOR FUTURE REFERENCE.
(If this tumbler changes ownership, be sure this manual accompanies
the tumbler.)
Part No. M413620R3
November 1998
NOTA: El manual en
español aparace después
del manual en inglés.

Table of Contents

Other manuals for Alliance Laundry Systems DTB50CG

Question and Answer IconNeed help?

Do you have a question about the Alliance Laundry Systems DTB50CG and is the answer not in the manual?

Alliance Laundry Systems DTB50CG Specifications

General IconGeneral
BrandAlliance Laundry Systems
ModelDTB50CG
CategoryDryer
Capacity50 lbs
Heat SourceGas
Voltage120/240 V
Phase1
Amperage15 A
TypeCommercial
Control TypeMicroprocessor

Summary

SECTION I Safety

Important Safety Instructions

Essential safety precautions for operating the tumbler to prevent hazards.

SECTION II Introduction

Information for Handy Reference

Details model applicability and conversion table for measurements.

Nameplate Location

Illustrates where to find model and serial numbers on the tumbler.

Parts Ordering Information

Provides contact details for obtaining literature or replacement parts.

SECTION III Installation Instructions

Receiving Inspection

Guide for inspecting the tumbler upon delivery for any shipping damage.

Materials Required (Obtain Locally)

Lists essential local materials for gas, electric, and steam tumbler connections.

Positioning and Leveling the Tumbler

Instructions on how to safely move, place, and level the tumbler for installation.

Enclosure and Facilities Requirements

Guidelines for tumbler enclosures, clearances, floor, layout, and venting.

Floor Requirements

Specifies floor load capacity and preparation for tumbler installation.

Layout and Venting Guidelines

Recommendations for tumbler placement, airflow, and exhaust ducting.

GAS REQUIREMENTS

Gas Connection Safety Warnings

Crucial warnings regarding gas connections, fire, and explosion risks.

Gas Piping Examples and Specifications

Illustrates gas loop and supply piping configurations and sizing for different capacities.

STEAM REQUIREMENTS

Steam Service Pipe Sizing

Guidelines for determining correct steam pipe sizes based on pressure and length.

Steam Inlet and Condensate Return Connections

Procedures for installing steam solenoid valves, traps, and condensate lines.

ELECTRICAL REQUIREMENTS

Electrical Safety and Grounding

Essential warnings and instructions for safe electrical connections and grounding.

Jumper Configuration Instructions

Guidance on setting jumpers for different voltage configurations (OPL Micro Control Models).

Ring Ferrite Installation

Instructions for installing a ring ferrite to protect electronic controls from electrical disturbances.

Model-Specific Electrical Specifications

Detailed electrical requirements, wire sizes, and breaker ratings for various tumbler models.

SECTION IV Adjustments

Main Gas Burner Air Shutter Adjustment

Procedure for adjusting the air shutter for optimal combustion and flame pattern.

Air Flow Switch Adjustment

Steps to adjust the air flow switch for proper tumbler operation and safety.

Cylinder Door Switch and Strike Adjustment

How to adjust the door switch and strike for proper door closure and safety shutoff.

SECTION V Operating Instructions

Manual Dual Timer Tumbler Operation

Step-by-step guide for operating the manual dual timer tumbler through a drying cycle.

Coin-Operated and Electronically Controlled Tumbler Operation

Instructions for operating coin-operated and OPL tumblers, including cycles and controls.

Reversing Operation and Controls

Explanation of the reversing feature and how to use the reverse control switch.

SECTION VI Preventive Maintenance Instructions

Daily Maintenance: Lint Removal

Daily procedure for cleaning the lint screen and compartment to ensure proper airflow.

Periodic Maintenance Checks

Scheduled maintenance tasks including lubrication, lint removal, belt tension, and overall checks.

TROUBLESHOOTING THE TUMBLER

Air Flow, Venting, and Gas Issues

Addresses problems related to airflow, venting, gas pressure, and burner adjustments.

Voltage, Damper, and General Operation Troubleshooting

Troubleshooting input voltage, back draft damper operation, and general tumbler issues.