EasyManuals Logo

Allied Systems W3C User Manual

Default Icon
60 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #46 background imageLoading...
Page #46 background image
32
Step 3. The operator moves the direction lever to the
LINE-IN position and the power lever to the POWER-
IN/OUT position. If the load is less than 75% of the
maximum line pull, the operator can begin traveling with
the vehicle at the same time. The winch will wind the
load toward the vehicle as it travels. If the load is nearly
the capacity of the line pull, the operator must move the
load close to the vehicle before beginning to travel.
Step 4. If the tractor or skidder must travel through
an area with bad traction conditions, the operator
can move the power lever to the BRAKE-OFF
position. This procedure will permit the vehicle to
move through the bad traction area without pulling
the load at the same time.

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Allied Systems W3C and is the answer not in the manual?

Allied Systems W3C Specifications

General IconGeneral
BrandAllied Systems
ModelW3C
CategoryWinches
LanguageEnglish

Related product manuals