EasyManua.ls Logo

Allied Systems W3C - Page 47

Default Icon
60 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
33
Step 5. When the vehicle is on fi rm ground, the
operator can move the direction lever to LINE-IN
and the power lever to POWER-IN/OUT to pull the
load toward the vehicle.
Step 6. When the operator wants to disconnect from
the load, the vehicle is stopped and the power lever
is moved to the FREESPOOL position to loosen the
wire rope. The wire rope is then disconnected from
the load.
Operating Techniques, PFR

Related product manuals