EasyManua.ls Logo

Allied Telesis AT-9924SP - About this Guide; Package Contents

Allied Telesis AT-9924SP
55 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
x900 Series Switch and SwitchBlade
®
x908
4
About this Guide
This Installation and Safety Guide describes how to install and log in to the
following switches:
You can download the complete document set for x900 Series switches and
SwitchBlade
x908 from www.alliedtelesis.com/support/software. For more
information about the document set and other resources, see “Obtaining
Documentation and Resources” on page 30.
Package Contents
Depending on the model, the switch is factory-fitted with the following power
supply and fan options:
AT-8948, AT-9924Ts, x900-24XT, x900-24XT-N, and x900-24XS switches
have a PSU and a FOM installed.
AT-9924T, AT-9924SP, x900-48FE, x900-48FE-N, and x900-48FS switches
have a PSU and a blanking plate installed.
x900-12XT/S has a fixed PSU installed.
SwitchBlade x908 has dual chassis fan modules and blanking plates installed,
but no PSUs. Power supplies must be ordered separately.
Power supply units (PSU) can be:
AT-PWR01, either AC or DC power supply unit
AT-PWR02, AC only power supply unit
AT-PWR05, either AC or DC power supply unit
How to install a PSU or fan in the switch is described in the Removable Power
Supply and Fan Installation Guide.
AT-8948 x900-12XT/S
x900-48FE AT-9924Ts
x900-48FE-N x900-24XT
x900-48FS x900-24XT-N
AT-9924T x900-24XS
AT-9924SP SwitchBlade
®
x908

Other manuals for Allied Telesis AT-9924SP

Related product manuals