EasyManua.ls Logo

Allweiler AEB1E Series - Page 4

Allweiler AEB1E Series
44 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Table of contents
iv
Series AEB1E, AEB2E, AEB2N
Construction Types ME, SE, VE
BA-2011.01
732.0005 GB - 201 100
7.3 Taking the pump out of
operation .................................... 14
7.3.1 Stoppage .................................... 14
7.3.2 Measures for longer periods of
downtime .................................... 14
7.4 Special applications of the pump14
8 Maintenance cycles and intervals ........ 15
9 Preventive Maintenance ........................ 16
9.1 Maintenance ............................... 16
9.1.1 General monitoring .................... 16
9.1.2 Universal joints ........................... 16
9.1.3 Shaft seal ................................... 16
9.1.3.1 Mechanical seal ......................... 16
9.1.4 Drive motors and (variable) gear16
10Maintenance ............................................ 17
10.1 Disassembly and assembly
instructions ................................. 17
10.1.1 Disassembling the progressing
cavity pump ................................ 17
10.1.2 Removing the stator ................... 17
10.1.3 Removing the rotor and rotor-
side joint ..................................... 18
10.1.4 Removing the universal joint
shaft and the drive-side joint ...... 19
10.1.5 Removing the shaft seal and
stub shaft .................................... 19
10.1.6 Removing the mechanical seal,
single-acting ............................... 19
10.2 Assembling the progressing
cavity pump ................................ 19
10.2.1 Installing the shaft seal and stub
shaft ........................................... 19
10.2.1.1 Installing the mechanical seal,
general ....................................... 19
10.2.1.2 Installing the mechanical seal,
single-acting ............................... 20
10.2.2 Installing the stub shaft with
shaft seal .................................... 20
10.2.3 Installing the rotor and rotor-side
joint ............................................. 21
10.2.3.1 Tightening with clamping tool PoK-
It II .............................................. 22
10.2.4 Installing the universal joint
shaft and the drive-side joint ...... 23
10.3 Installing the stator ..................... 23
11Spare parts .............................................. 24
11.1 Index of spare parts and
recommended spare/reserve
parts ........................................... 25
11.2 Sectional drawings for ME
construction type ........................ 27
11.3 Sectional drawing of SE
construction type on leveling
feet ............................................. 28
11.4 Sectional drawings for SE
construction type ....................... 29
11.5 Sectional drawings for VE
construction type ....................... 30
12Causes and removal of operational
faults ....................................................... 31
13Clearance certificate .............................. 33
14Declaration according to EC
machinery directive ............................... 34

Table of Contents