SPC 20 OPERATOR’S MANUAL
STORAGE AND TRANSPORTATION F-5
ENGINE
- Use compressed air and/or water to clean the entire engine, including oil cooler fins. (See High
Pressure Cleaning in Service Section)
- Replace engine oil and filter.
- Drain fuel from fuel tank and replace fuel filter.
- Add diesel fuel conditioner and fill tank to prevent condensation.
- Run engine for 10 minutes to allow conditioner to circulate through engine fuel system.
NOTE: Start engine once a month and let run for 30 minutes to allow battery to
charge and keep upper cylinder areas lubricated.
COMBINE
- Use compressed air to blow out engine compartment, threshing chambers, inside of head, augers,
sieves, operator platform, and any other area that collects plant material.
- Wash entire machine including conveyor belts with mild detergent and water. Wax painted surfaces
if desired. (See High Pressure Cleaning in Service Section)
- Grease all bearings.
- Clean and oil all chains.
- Start up engine and engage clutch at idle for a few minutes to work in grease and oil.
- Paint bare metal if desired.
- Loosen all V-belts and conveyor belts.
- Spray control cable ends, conveyor belt lacing, and adjuster threads with light oil.
- Mouse proofing is highly suggested. Place mothballs or rodent poison throughout machine.
BATTERY
- Clean battery terminals and cable ends.
- Remove battery to prevent freezing and discharge if desired.
DANGER!
Batteries contain sulfuric acid and can explode. Keep sparks and flame away when
checking, filling, or charging batteries.
NOTE: Inspect the combine, schedule service, and order replacement parts, so that required
maintenance is not forgotten in the off season.