ressure tested; the circulatin
he heat source system is completed, inspected and
hecked on: .............................................................................
: ...............................................................................................
nature: .......................................................................................
eneral checklist and the com
or a technician authorized b
.
FOR PREPARATION OF THE COMPLETION REPORT FOR HEAT PUMP SYSTEMS
eneral checklist is intended as an aid for the installation and assembl
ersonnel. It makes no claim to be exhaustive.
evertheless, all items must be checked carefull
inimum cross-section is me
heat source circulating pum
ype of anti-freeze agent (please enter
es
Frost protection inspected down t
ype of anti-freeze agent (please enter
ydraulic integration
Integration o
the heating heat pump into the
heating system corresponds to the planning
es
Shut-off devices are correctly set
stem lled, air-free and seale
ll heating circuits can be opene
r
Type: Hot-water tank (please enter)
ll electrical components are permanentl
not a
construction site connection
1) checked with specifications.
2) The minimum volume flow must be
ensure
uarantee is given if tanks are used which are not made by Alpha-
InnoTec GmbH or are not a
$=:3)RUPEODWW8.L
We reserve the right to modify technical specifications without prior notice.
UK830501/200520 © Alpha-InnoTec GmbH
General checklist