Installation and Servicing
Instructions
Evoke 28 and 33
Wall Mounted, Fan Assisted, Room Sealed,
Gas Fired, High Efficiency Condensing Combination Boiler
Nepicar House, London Road,
Wrotham Heath, Sevenoaks,
Kent TN15 7RS
For Technical help or for Service call ...
ALPHA HELPLINE Tel: 0344 871 8764
website: www.alpha-innovation.co.uk
Set for use with Natural Gas
Leave these instructions with the User
These instructions have been carefully prepared but we reserve the right
to alter the specification at any time in the interest of product improvement.
© Alpha Therm Limited 2018.
Part No. 1.042372 rev. ST.003782.000
0918/D386
Alpha Evoke 28 (NG) G.C. No. 47 532 71
Alpha Evoke 28 (LPG) G.C. No. 47 532 75
Alpha Evoke 33 (NG) G.C. No. 47 532 72
Alpha Evoke 33 (LPG) G.C. No. 37 532 76

Table of Contents

Question and Answer IconNeed help?

Do you have a question about the Alpha Evoke 28 and is the answer not in the manual?

Alpha Evoke 28 Specifications

General IconGeneral
Output28kW
Flow Rate11.4 l/min
ERP RatingA
DHW Output (kW)28kW
TypeCombi
MountingWall Mounted
Central Heating Pressure3 Bar

Summary

TECHNICAL DATA

3.6 ELECTRICAL CONNECTIONS

Wiring details and safety for electrical connections.

GENERAL BOILER INFORMATION

4.2 ELECTRICAL SUPPLY

Electrical connection requirements and safety.

4.5 FLUE TERMINAL LOCATION

Guidance on safe and compliant flue terminal positioning.

4.8 FILLING THE CENTRAL HEATING SYSTEM

Procedure for filling and pressurising the heating system.

INSTALLATION

5.4 FIT THE BOILER

Procedure for mounting the boiler onto the bracket.

5.5 CONNECT THE PIPEWORK

Steps for connecting heating and hot water pipes.

5.6 FIT THE FLUE

Instructions for installing the flue system.

5.10 CONNECT THE MAINS SUPPLY

Electrical connection of the mains supply.

COMMISSIONING

6.1 FILL THE SYSTEM

Procedure for filling and venting the system.

6.3 TEST FOR GAS TIGHTNESS AND PURGE THE SUPPLY

Checks for gas tightness and purging.

6.4 INITIAL LIGHTING

Steps for lighting and initial operation of the boiler.

6.6 CHECKING THE COMBUSTION

Procedure for checking and adjusting combustion levels.

ROUTINE SERVICING

COMPONENT REPLACEMENT

8.3 IGNITION AND SENSING ELECTRODES

Replacing ignition and sensing electrodes.

8.4 MAIN BURNER

Replacing the main burner assembly.

8.5 FAN

Replacing the fan assembly.

8.9 GAS VALVE

Replacing the gas valve.

8.13 PRIMARY HEAT EXCHANGER

Replacing the primary heat exchanger.

ERROR CODES AND FAULT FINDING

9.1 CARRY OUT INITIAL FAULT FINDING CHECKS

Initial steps for diagnosing faults.

9.2 ERROR CODES AND FAULT FINDING

Table of error codes, descriptions, and causes.

GAS BOILER SYSTEM COMMISSIONING CHECKLIST

FILL AND PRESSURISE THE SYSTEM

OPERATING THE BOILER