EasyManua.ls Logo

Alpine UTX-A09 - Unit Installation Procedures; Head Unit Installation; Controller Installation Preparation

Alpine UTX-A09
48 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Installation
Installing the Head Unit
Note
Do not block the radiation device of the unit to avoid influencing the ventilation. Doing so may cause heat to build up inside and may
result in fire.
For details about the unit installation, please consult your authorized Alpine dealer.
Installing the Controller
Preparation
1 Check the accessories.
Controller cable (2.5 m)
Controller tray (used for reverse mold installation)
Controller bracket
Adhesive tape (x2)

Related product manuals