seconds anywhere in the main reading menu, the
which is highlighted by the bl
inking of the green LED (RUN
TEST of Leds L1-L8 and display
X.. auxiliary relay caused the tripping of the
same. The associated command and/or signalling can therefore
be sent. This is why, before ru
if, upon confirming the execution, LB or DB synchronization
cycles are already present, the test
is not performed and this
condition is signalled by the following example:
The test on leds and display makes these
during any operating condi
menu, the TEST function is disabled; the
stops blinking and the system goes back to the
This useful and versatile device allows the automatic parallel of
generators of any type and dimensions to be
It can be used with line or
star voltages and, in the event of TV
installed up- or downstreams an odd group step-up transformer,
with a star or line voltage without the application of any TV