RI820246 - 06/18 Ind A
25

 

1 standard electrical power socket (not supplied).
2 shut-off valves (not supplied).
Standard sealing compound for the union threads (not supplied).
1 standard isolator (not supplied).
1 siphon with standard isolator (not supplied) on brine outlet.
TH test strips or a reagent (not supplied) for the testing and setting up of the water softener.
- DO NOT ELECTRICALLY CONNECT THE WATER SOFTENER YET
- CLOSE THE WATER MAINS TAP
- DRAIN THE PIPE ON WHICH THE WATER SOFTENER IS TO BE INSTALLED
2 hoses 3/4" (not supplied).
Accessoriesrequired:
-
DO NOT ELECTRICALLY CONNECT THE WATER
-
CLOSE THE WATER MAINS
-
DRAIN THE PIPE ON WHICH THE WATER SOFTENER IS TO BE
20
1 standard electrical power socket (not supplied).
2 shut-off valves (not supplied).
Standard sealing compound for the union threads (not supplied).
1 standard isolator (not supplied).
1 siphon with standard isolator (not supplied) on brine outlet.
TH test strips or a reagent (not supplied) for the testing and setting up of the water softener.
2 hoses ¾” (not supplied).
1–Valvebeforeinstallation
2–Standardisolator
3–20micronsfiltration
4–Hoses
5–Electrictransformer
6–Brineevacuationpipe
7–Overflowevacuationpipe
8–Siphonwithisolator