EasyManua.ls Logo

Anzzi SP-AZ078 - Step 6: Final Hanging and Testing

Anzzi SP-AZ078
12 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
pg. 8
STEP 6
The mixing valve will not function properly if the connections are incorrect.
Before hanging the shower panel onto the wall, turn on shut-off valves and test all water
functions of the shower panel and check all connections for leaks.
Make sure that the hoses are in the shower panel enclosure.
Connect shower panel water supply hose to the existing plumbing and the mixing valve.
6-1
6-2
Slide the shower panel down until it rests on the mounting brackets you installed. The shower
panel must be seated onto the mounting brackets by pulling down the shower panel.
6-3
Have questions? Call us at 305-614-4070 or visit us at www.ANZZI.com

Related product manuals