EasyManua.ls Logo

APC 5000VA - Page 11

APC 5000VA
13 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
CSI SECTION 16611 STATIC UNINTERRUPTIBLE SYSTEM
7. TurboLinux v.7.0 and 8.0
8. Novell Netware 6.0 with Support Pack 1
9. Novell Netware 6.5
10. Novell Netware 5.1 with Support Pack 3 or above (using PowerChute Business
Edition v6.2.2 agent)
11. Sun Solaris 8 and 9
PART 4 - Part 4 - EXECUTION
4.1 FACTORY ASSISTED START-UP
If a factory assisted UPS start-up is requested, factory trained service personnel shall
perform the following inspections, test procedures, and on-site training:
A. Visual Inspection:
1. Inspect equipment for signs of damage.
2. Verify installation per manufacturer s instructions.
3. Inspect battery modules.
B. Mechanical Inspection
1. Check all UPS and external service bypass panel internal power wiring
connections.
2. Check all UPS and external service bypass panel terminal screws, nuts, and/or
spade lugs for tightness.
C. Electrical Inspection:
1. Verify correct input and bypass voltage.
2. Verify correct UPS control wiring and terminations.
3. Verify voltage of all battery modules.
4. Verify neutral and ground conductors are properly landed.
5. Inspect external service bypass panel for proper terminations.
D. Site Testing:
CSI SECTION 16611 STATIC UNINTERRUPTIBLE SYSTEM

Other manuals for APC 5000VA

Related product manuals