Step 8 Connect APsystems Microinverters to Grid
Step 9 AC Extension Cable
When an AC extension cable is required, users can either connect the AC bus cable and AC extension
optional accessories.
a. Please install bi-polar circuit breakers with the appropriate rated current or according to local
regulations. These circuit breakers are mandatory for grid connection.
Step 10 Complete the APsystems installation map
a. Each APsystems Microinverter comes with 2 removable serial number labels.
b. Complete the installation map by affixing the ID label of each microinverter at the appropriate location.
c. The second serial number label can be adhered to the solar module frame. This label will assist in later confirmation of the microinverter's position without the need to dismantle the PV module.
NOTE:
the map (refer to the ECU instruction manual for further details).
METER
PE
L N
We, ALTENERGY POWER SYSTEM INC.
Of
Building 2, No. 522, Yatai Road, Nanhu District, Jiaxing City, Zhejiang 314050, China declare under our sole responsibility that the product
Model No.: DS3D, DS3D-EU, DS3D-H, DS3D-H-EU, DS3D-L, DS3D-L-EU, DS3D-SH, DS3D-SH-EU
Safety
Health
EMC
Radio
Title: Director
Address: Jiaxing, China
We hereby declare that all essential radio test suites have been carried out and that the above named product is conformity to all the essential requirements of
OR
EU DECLARATION OF CONFORMITY
*Customer using AC junction box, please prepare it by yourself.