EasyManua.ls Logo

APsystems YC600 - Important Safety Instructions; Safety Instructions

APsystems YC600
3 pages
Print Icon
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
2019/06/20 Rev4.1 Quick Installation Guide
3
Step 7. Place the PV modules and connect each YC600 to the PV modules
Step 8. Finalizing the APsystems installation
a. Each APsystems microinverter has removable serial number labels.
b. Peel labels off, affix one to the respective location on the APsystems installation map, and fill in 1,2 in the
label below, according to the layout on the roof.
c. The other serial number label posted on the solar module frame is easy to find.
d. Log on to the EMA with your installer access details, then you can create a user account in EMA and
register the installation (including the ECU). There, you can also upload a photo of the installation map.
NOTE: you can request an EMA installer account at https://emea.apsystems.com/resources/register/
NOTE: Sequence of steps 1 to 8 can be changed depending on the installation.
NOTE: Using APsystems' mobile app ECUAPP can make the installation and registration much simpler when there is an ECU
included in the installation.
Step9.Start the operation
1. Turn on the AC circuit breaker on each microinverter AC branch circuit.
2. Turn on the main utility-grid AC circuit breaker. Your system will start producing. power after a two-minute waiting
time.
Product information is subject to change without notice.
(Please download manuals at emea.APsystems.com).

Other manuals for APsystems YC600

Related product manuals