EasyManua.ls Logo

Aqualisa Aquarian Thermo User Manual

Aqualisa Aquarian Thermo
19 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
Aquarian Thermo installation instuctions page 1
Aquarian
®
Thermo
shower valve
Question and Answer IconNeed help?

Do you have a question about the Aqualisa Aquarian Thermo and is the answer not in the manual?

Aqualisa Aquarian Thermo Specifications

General IconGeneral
BrandAqualisa
ModelAquarian Thermo
CategoryBathroom Fixtures
LanguageEnglish

Summary

Shower Systems

Aquarian Thermo Surface Mounted Valve

Details available finishes (Chrome, White, White/chrome) and product codes for the Aquarian Thermo valve.

Components

Product Components Overview

Illustrates and lists the various components included with the Aquarian Thermo shower valve.

Important Information

Introduction, Safety & Flushing

Provides an overview, safety guidelines, and flushing instructions for the shower valve.

Connections, Valves & Filters

Explains pipe connections, requirements for isolation valves, and filter system details.

Siting, Pressure & System Types

Covers optimal siting, pressure limits, PRV use, and compatibility with different water systems.

Installation Guide

Surface Mounted Flexible: Initial Fixings

Guides on fixing the valve, marking pipe entries, and preparing the wall surface.

Surface Mounted Flexible: Shroud Removal

Instructions for carefully removing the upper and lower shroud assemblies.

Installation Steps

Surface Mounted Flexible: Pipe Prep & Regulator

Preparing supply pipes, flushing, fitting flow regulator, and mounting the valve.

Final Installation Steps

Surface Mounted Flexible: Shroud Refit & Leak Check

Refitting shrouds, performing leak checks, and attaching the badge.

Concealed Head Installation

Concealed Head: Initial Fixings & Shroud Removal

Fixing the valve, marking pipe entries, and removing shroud assemblies.

Concealed Head Steps

Concealed Head: Pipe Prep & Outlet Change

Preparing pipes, flushing, removing cartridge, replacing outlet, fitting regulator.

Concealed Head Final Steps

Concealed Head: Assembly & Leak Check

Refitting cartridge, mounting valve, leak checks, and fitting blanking cap.

Further Installation

Concealed Head: Upper Shroud & Badge

Refitting the upper shroud assembly and attaching the badge.

Reversed Supplies Installation

Reversed Supplies: Prep & Cartridge Rotation

Removing components, noting orientation, and rotating the cartridge assembly.

Reversed Supplies Adjustments

Reversed Supplies: Control Updates & Refit

Replacing graphic ring, control knob, outlet connection, and refitting assembly.

Post-Installation Procedures

Commissioning the Shower Valve

Procedures for setting and adjusting the maximum temperature stop.

User Guide

Shower Operation

Instructions on turning the shower on and adjusting temperature.

Cleaning and Filter Maintenance

Guidance on cleaning the valve using soft cloth and maintaining inlet filters.

Troubleshooting Guide

Water Output Issues

Diagnosing and resolving problems with water temperature and output.

Flow Rate & Temperature Fluctuations

Addressing poor flow rates and fluctuating temperatures.

Typical Installation Diagrams

Gravity, Pumped & Thermal Storage Systems

Diagrams for gravity, pumped, and thermal storage system connections.

UHW & Combination Boiler Systems

Diagrams for UHW and combination boiler system connections.

Related product manuals