EasyManua.ls Logo

Aqualisa E99.01T - Page 8

Aqualisa E99.01T
19 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Aquarian Thermo installation instuctions page 8
Refit the lower shroud by locating the lugs
into the back plate and move the shroud into
position. Align the fixing screws with the screw
holes, and fix into place ensuring not to
overtighten the fixing screws.
9
The installation may now be checked for leaks. Turn the on/off knob
(left hand knob) fully forwards to ensure the valve is fully turned off.
Attach the shower hose to the ⁄÷™” BSP outlet on the underside of the valve to
allow the water to discharge safely to waste.
10
Refit the upper shroud assembly by locating the lugs into the back plate and
moving the shroud down into position. Fix using the centrally located locking
screw taking care not to overtighten.
12
Turn on the supplies and check for any leaks
upstream of the valve. Slowly open the on/off
control and check for leaks downstream of the
valve. If all is sound, turn off the on/off knob
fully and turn off the supplies.
11
Remove the paper backing from the badge
and push firmly into position in the recess
in the shroud assembly.
13

Related product manuals