10
Aquasure Quantum Series Multi-Stage ver1 ver2.0 (Size: A4 _ 210 x 297 mm)
SYSTEM INSTALLATION
STEP 1: Shung the water supply
1. Shut off the main water supply valve. Locate the main water supply valve
of the house and turn off completely by turning the shut-off handle
clockwise. If the main water supply valve fails to shut off the water
completely during the test, we recommend contacting your local plumber
to x the valve before begin installing the system.
2. Test to see if the water is completely shut off by turning on the closest
faucet in the cold water position. If the cold water cannot be shut off,
please contact your local plumber to x the valve before beginning
system installation.
STEP 2: Mounng the system
1. Prep and survey the mounting location.
IMPORTANT: Please consider the mounting location and installation
method before proceeding. Failure to securely fasten the system can
result in damage to the system and plumbing.
IMPORTANT: This system requires maintenance and replacement of the
UV lamp and lters. Install the system in an area that has clearance above
and below the system for removing the UV lamp and lters. Ideally, the
system should have lamp + 12” from the top of the system housing.
Note: System mounting location
requires clearance above and below the
system. Clearance below the system for
removal and replacement of the pleated
sediment lter and SPX lter cartridges.
Clearance above the system is needed
for replacement of the UV lamp.
Failure to provide adequate clearance
could result in damage and/or the
need to uninstall the system with each
maintenance interval.
Aquasure Quantum Series Multi-Stage ver1 ver2.0.indd 10Aquasure Quantum Series Multi-Stage ver1 ver2.0.indd 10 11/9/22 9:16 AM11/9/22 9:16 AM