EasyManua.ls Logo

ARAG 520005 - Reactive Maintenance; Pipe Repairs; Fuse Replacement

ARAG 520005
24 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
14
7.5 Reactive maintenance
To ensure dense and lasting formation of foam, replace the sponges code 520000.160
(D, Fig. 14a +14b) every year.
7.6 Pipe repairs
If the hoses break, repair them with one of the snap ttings (code 520005.352 or
520005.353) provided with the package.
Proceed as follows:
Fig. 18
7.7 Fuse replacement
Before replacing the fuse, disconnect the control box from the battery.
Fig. 19
•Lift the fuse holder cap (A) onto the power cable.
•Replace the old fuse (B) with a new one of the same
type (10 A): the package includes a spare fuse.
•Recap and check for proper cap position.
•Use a pair of scissors to trim the
broken ends of the hose.
•Fit the two ends into the tting.

Related product manuals