EasyManua.ls Logo

Archer D1x - Shifter Preparation; Install Shifter Batteries; Install Shift Cable and Housing

Archer D1x
8 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Step 3: Shifter Preparation
1. Install Batteries
Remove the small screw holding the battery
door cover closed with a 1.5mm hex driver.
Insert the two 14500 li-ion rechargeable
batteries into the battery channel,
POSITIVE END FIRST.
Close the battery door and tighten the screw.
Note:Do not use alkaline AA batteries. Although they are the same size,
they run a much lower voltage and the shifter will not perform well.
2. Install Shift Cable
Place the shifter along your chainstay and measure the cable and bowden
housing lengths you will need for your bike. Keep the housing as smooth
as possible. You may need to pre-bend it to get the right shape for your bike.
Peel back the bumper to expose the cable opening.