
Do you have a question about the Asco 200 Series and is the answer not in the manual?
| Series | 200 |
|---|---|
| Poles | SPDT |
| Standards | UL, CSA |
| Switch Type | Pressure |
| Housing Material | Aluminum |
Guidance on mounting the ATSE in an enclosure and proper grounding procedures.
Instructions for power, engine starting, interconnecting, and auxiliary circuit wiring.
Procedure for checking manual operation and performing the functional test of the ATSE.
Steps to check phase-to-phase and phase-to-neutral voltages at the ATSE terminals.
Procedure for checking electrical operation and performing the transfer test of the ATSE.
Describes the automatic sequence for transferring load to the emergency source when normal source fails.
Describes the automatic sequence for retransferring load to the normal source when it is restored.
Covers preventive maintenance, controller handling, and transfer switch testing procedures.
Procedure for manual load transfer and common troubleshooting checks for the ATSE.
How to adjust time delay and sensor settings using DIP switches and potentiometers.
Step-by-step instructions for changing potentiometer and DIP switch settings on the controller.
Details on the built-in engine exerciser for weekly testing with or without load transfer.
Description of the optional exerciser providing seven days of programmable exercise periods.
Instructions for setting the exerciser clock, programming periods, manual override, and time changes.
Features for motor load transfer monitoring and load disconnect timing before transfer.
Configuration of remote test, transfer to emergency, and inhibit transfer features.
Loading...