EasyManua.ls Logo

Asus Pro WS X299 SAGE II - Installing Four SLI-Ready Graphics Cards

Asus Pro WS X299 SAGE II
134 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
ASUS Pro WS X299 SAGE II
5-9
Chapter 5
4. Align and rmly insert the 3-way SLI
®
bridge connector to the goldngers on
each graphics card. Ensure that the
connector is rmly in place.
5. Connect three independent auxiliary
power sources from the power supply
to the three graphics cards separately.
6. Connect a VGA or a DVI cable to the
graphics card.
3-way SLI
®
bridge
5.2.4 Installing four SLI-ready graphics cards
To install four SLI-ready graphics cards:
1. Prepare four SLI-ready graphics cards.
2. Insert the four graphics cards into the PCIEX16 slots. If your motherboard has more
than two PCIEX16 slots, refer to Chapter 1 in this user manual for the locations of the
PCIEX16 slots recommended for multi-graphics card installation.
3. Ensure that the cards are properly seated on the slots.
4. Align and rmly insert the 4-way SLI
®
bridge connector to the goldngers on each
graphics card. Ensure that the connector is rmly in place.
5. Connect four independent auxiliary power sources from the power supply to the four
graphics cards separately.
6. Connect a VGA or a DVI cable to the graphics card.
4-way SLI
®
bridge

Table of Contents

Related product manuals