EasyManuals Logo

Atag i28C Technical Guide

Atag i28C
64 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #58 background imageLoading...
Page #58 background image
Full Service
For reasons of safety and economy, it is recommended that the boiler is serviced annually. Servicing must be
performed by a competent person in accordance with BS 7967-4.
After servicing, complete the relevant Service Interval Record section of the Benchmark Checklist, located on the
inside back page of the installation & servicing instructions.
Where a full service is required the following steps must be followed:
Carry out the actions as described in the interim service section.
Fan unit and burner cassette
Remove the Velcro from the silencer and remove the silencer (1)
Unscrew the coupling (2) of the gas block and the coupling on the venturi (3) and remove the gas line (4)
1
4
3
2
1
58

Other manuals for Atag i28C

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Atag i28C and is the answer not in the manual?

Atag i28C Specifications

General IconGeneral
BrandAtag
Modeli28C
CategoryBoiler
LanguageEnglish

Related product manuals