EasyManua.ls Logo

Atek 1-10KVA - Safety and EMC Instructions; Installation Guidelines

Default Icon
40 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
1. Safety and EMC instructions
Please read carefully the following user manual and the safety instructions
before installing the unit or using the unit!
1.1 Installation
Condensation may occur if the UPS is moved directly from a cold to a warm environment.
The UPS must be absolutely dry before being installed. Please allow an acclimatization
time of at least two hours.
Do not install the UPS near water or in damp environment.
Do not install the UPS where it would be exposed to direct sunlight or near heat.
Do not block ventilation openings in the UPSs housing.
Do not connect appliances or items of equipment which would overload the UPS (e.g. laser
printers, etc) to the UPS outlet sockets.
Place cables in such a way that no one can step on or trip over them.
For 1KVA/2KVA/3KVA
Socket-outlets and socket of batteries are earthed by the input power cord, please insert the
power cord into mains socket before using of UPS.
Connect the UPS only to an earthed shockproof socket outlet.
The building wiring socket outlet (shockproof socket outlet) must be easily accessible to
close to the UPS.
This is operator installable .
For 6KVA/10KVA
UPS has provided earthed terminal, in the final installed system configuration, equipotential
earth bonding to the external UPS battery cabinets.
An integral single emergency switching device which prevents further supply to the load by
the UPS in any mode of operation should be provided in the building wiring installation.
An appropriate disconnect device as short-circuit backup protection should be provided in
the building wiring installation.
For three-phase equipment connection to an IT power system, a four-pole device which
disconnect all phase conductors and the neutral conductor should be provided in the
building wiring installation.
This is permanently connected equipment , it must be installed by qualified maintenance
personnel.
Earth connection essential before connecting to the building wiring terminal.