EasyManuals Logo

Atlas Copco CR Series User Manual

Atlas Copco CR Series
53 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #22 background imageLoading...
Page #22 background image
20 2022 2096 26
Instruction book
3 Installation
3.1 Installation instruction
Install the unit in an area where the noise levels do not cause inconvenience and adequate ventilation is
available for cooling purposes.
Before commencing installation, check that the electrical data on the compressor
specification plate/s are compatible with the local power supply. Before connecting
the electricity, ensure that the power supply is off and correctly isolated.
The electrical power supplied to the compressor unit must be connected by a
qualified electrician in accordance with the wiring diagram supplied with the plant.
All wiring must be in accordance with UL regulations. Cable sizes given in section.
Electric data are recommendations only.
Installation proposal for CR with vertical receiver

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Atlas Copco CR Series and is the answer not in the manual?

Atlas Copco CR Series Specifications

General IconGeneral
BrandAtlas Copco
ModelCR Series
CategoryAir Compressor
LanguageEnglish

Related product manuals