EasyManua.ls Logo

Atlas Copco XAS 88 G Kd APP - Page 37

Atlas Copco XAS 88 G Kd APP
92 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
- 37 -
DAILY MAINTENANCE UNDERCARRIAGE BEFORE A ROAD GOING JOB
MAINTENANCE SCHEDULE COMPRESSOR
Check towbar, handbrake lever, spring actuator,
reversing lever, linkage and all movable parts for ease
of movement
Check coupling head for damage
Check height of adjusting facility see Height adjustment
Check tyre pressure see Technical specifications
Check safety cable for damage
For fluids to be used and their ordering
numbers refer to the spare parts manual.
To determine the maintenance intervals, use service hours, or calendar time, whichever occurs first.
Maintenance schedule (running hrs) 50 hrs after
initial start-
up
Every
250 hrs
Every
500 hrs
Every
750 hrs
Every
1000 hrs
Yearly 2 Yearly
For the most important subassemblies, Atlas Copco has developed service kits that combine all wear parts. These service kits offer you the benefits of genuine parts,
save administration costs and are offered at a reduced price, compared to individual components. Refer to the parts list for more information on the contents of the
service kits/service paks and their ordering numbers.
Change engine oil
(2)
xx x
Replace engine oil filter
(2)
xx x
Check for leaks in engine, compressor,
air, oil, or fuel system
xx x
Check torque on critical bolt connections x x x
Hoses and clamps - Inspect/Replace x x x

Related product manuals